Tuesday, 28 July 2026Canarias 26°/ 22°

canariasred

Breaking

Canalink

Latest canalink news

1 article

Illustrative image: submarine cable laid on the seabed with a remotely operated vehicle in the background

Canalink begins laying the submarine cable connecting Gran Canaria, Fuerteventura and Lanzarote

Canalink has started laying a 553 km submarine cable connecting Gran Canaria, Fuerteventura and Lanzarote, with an investment of 34 million euros.